• Fixing our leaking cowl vent

    During the winter we realized that we had some leaking cowl vents. At least one of the cowl vents were leaking and rain water and melted snow gathered inside the plastic. When the temperature dropped below freezing a crack appeared. Since it was winter when this happened all we could do at the time was to cover it as good as possible and wait for spring. Now it is spring and it was time to fix this! In total we have three vents on deck, and we knew that one of them was leaking. The other two hadn’t caused any problem so far but we removed them as well to…

  • Alternator charges with too high voltage

    Sunday also meant boat work and it was time to move Anne-Mon from the winter location to our ship. During the summer we will have a spot in a marina further out in the archipelago, but that is pretty far away so it is perfect to have her next to the ship for a while. Since we have connected the service batteries we also wanted to test the alternator on the engine. We haven’t done this before and during our engine renovation we didn’t do any work with the alternator, we had just hoped that it would work. We magnetized the alternator by applying 12V to the D+ pin with…

  • Electrical installation for the engine

    Weekend and Saturday meant working with the boat, and most of the day we worked with the electrical installation for the engine. Our goal with the electrical system overhaul right now is to get the electrics around the engine to work. The rest of the system will we go over thoroughly later on. We also worked a little bit with preparing the cockpit. Hopefully it will get warmer soon and we will be able to continue with the plastic repairs. Next up will be to continue with the electrical system and move the boat from its winter location. If you are interested in reading more about our electrical systems all…

  • Cables, cables, cables…

    The final day of Easter meant more boatwork and organizing cables in the boat. We also went on a shopping tour, bought some stuff for the electrical system and the sliding hatch. We will add a separate blog post about the work we have done so far regarding the sliding hatch, so stay tuned. Before we started working we decided to do a little remake of how we started with the electrical system. We moved the position of the current shunt for the battery monitor. Now it is placed between the negative terminal of the service batteries and the negative terminal of the start battery. All ground connections are made…

  • Easter tour and boatwork

    It is Easter holiday now which means four days off work. The first day we took a tour with our ship Aline to the island Storön in the archipelago together with some other ships. It was definitely summer feelings in Stockholm with 20 degrees (68 Fahrenheit) and we brought our sliding hatch and Thomas worked with it for a while. We spent one night out and then drove back in the evening. The following day we went to the sailboat to continue working. First up was to add our new stop wire we bought. The old one was glitching and we want to have a reliable stop wire. We still…