Cleaning the bilge and new holding tank plans
After we took out the water tank that would be our holding tank, some cleaning of the bilge underneath the tank was needed since it wasn’t exactly clean. We had cleaned the bilge under the engine when we took the engine out last year, but not the part of the bilge in front of the engine. If you want to read more about our engine renovation, click HERE. When we bought Anne-Mon there was a lot of this old boat smell and when cleaning the bilge under the engine we got rid of some of the smell, but not completely. So, now when the tank is out it was a…
-
Cables, cables, cables…
The final day of Easter meant more boatwork and organizing cables in the boat. We also went on a shopping tour, bought some stuff for the electrical system and the sliding hatch. We will add a separate blog post about the work we have done so far regarding the sliding hatch, so stay tuned. Before we started working we decided to do a little remake of how we started with the electrical system. We moved the position of the current shunt for the battery monitor. Now it is placed between the negative terminal of the service batteries and the negative terminal of the start battery. All ground connections are made…
-
Easter tour and boatwork
It is Easter holiday now which means four days off work. The first day we took a tour with our ship Aline to the island Storön in the archipelago together with some other ships. It was definitely summer feelings in Stockholm with 20 degrees (68 Fahrenheit) and we brought our sliding hatch and Thomas worked with it for a while. We spent one night out and then drove back in the evening. The following day we went to the sailboat to continue working. First up was to add our new stop wire we bought. The old one was glitching and we want to have a reliable stop wire. We still…
-
Continuing with electrical system overhaul and our sails
During the weekend we first did some work on our ship, Aline. We also took a look at the sails we have for our ketch rigged sailboat, more about them below.
-
First drive after Volvo Penta renovation
It was time to finalize the installation of the engine so that we could test it after our Volvo Penta renovation. We had lifted it to the correct position and we needed to connect the gearbox to the engine and the propeller shaft and connect diesel, sea water, cooling system to the boiler and some electricity to the engine before we could do a test start inside the boat. First up was to assemble the gearbox and then connect it to the shaft. The gearbox need to be inserted precisely to its correct position and we used our rig (that we used when lifting the engine into position) to get…