-
Electrical system work
The autumn has arrived early in Sweden and the entire weekend there has been some rain, so instead of going sailing we worked with the boat. Most of the work this weekend has been focused on getting electricity to more functions. We will redo the entire electrical system on the boat, even though some of it where connected when buying the sailboat, the boat has been left alone for over 10 years so some of it needs to be changed anyway. We also want to have good knowledge of our electrical system so that if (or when) something breaks we can easily fix it, because we have made the electrical…
-
Birthday celebration and boat work at Björkskär
Next part of our sailing/boatwork week, we sail to Björkskär, install a solar panel, celebrate Petra’s birthday and get the sea water pump working. We left Horsholmen and started sailing towards Björkskär in the outer archipelago. The winds where still strong and we started by setting the furling head sail and sailed with it until we arrived to Björkskärsfjärden where we hoisted the main sail as well (we had taken the furling head sail down before to pass through a narrow strait). The wind where still quite strong, 18-20 knots gusting around 22 knots. Our initial plan was to head for Stora Nassa so we set a course so that…
-
Battery installation
It was time to make a safe arrangement for our batteries. Our battery box is a little bit bigger than our batteries, and we wanted to have some support in the box so that they won’t move when the boat tilts. We will have a some pieces of wood around the batteries in the box and an extra strap to tighten the batteries down. We painted them white so that they will look nice 🙂 During the weekend it has been raining a lot here in Stockholm, which was a perfect opportunity to see if the cowl vents we repaired last weekend wasn’t leaking anymore. What we can see they…
-
Electrical installation for the engine
Weekend and Saturday meant working with the boat, and most of the day we worked with the electrical installation for the engine. Our goal with the electrical system overhaul right now is to get the electrics around the engine to work. The rest of the system will we go over thoroughly later on. We also worked a little bit with preparing the cockpit. Hopefully it will get warmer soon and we will be able to continue with the plastic repairs. Next up will be to continue with the electrical system and move the boat from its winter location. If you are interested in reading more about our electrical systems all…
-
Cables, cables, cables…
The final day of Easter meant more boatwork and organizing cables in the boat. We also went on a shopping tour, bought some stuff for the electrical system and the sliding hatch. We will add a separate blog post about the work we have done so far regarding the sliding hatch, so stay tuned. Before we started working we decided to do a little remake of how we started with the electrical system. We moved the position of the current shunt for the battery monitor. Now it is placed between the negative terminal of the service batteries and the negative terminal of the start battery. All ground connections are made…



